ANALISIS SISTEM INFORMASI , OPTIMALISASI WAKTU DAN BIAYA ,KUALITAS FUNGSIONAL TERHADAP KUALITAS PROYEK DAN KINERJA PERUSAHAAN CV PUTRA TIGA SEKAWAN

Puji Rahayu, Andi Tri Haryono, Leonardo Budi Hasiholan

Abstract


This research aims to know the analysis of information system, optimizing time and costs, the quality of functional projects and to the quality of the company's performance in Cv PutraTiga Sekawan. Respondents to this study 50 employees in Cv Putra Tiga Sekawan. The sampling techniques used in this research is by questionnaire and interview. The method used in this research is the census method, where in the analysis using the program SPSS version 16.0. Based on the results of calculation show that the system variable information, optimizing the functional quality of the time and cost to the quality of the projects that have an impact on improving the company's performance is significant. Adjusted R Square Step 1 (0.748) shows that the percent of 74.8 variant of the quality project is explained by the independent variables in the regression equation. While other 25.5 percent is explained by other variables that are not in this research and meticulous in Adjusted R Square step 2 (0.736) shows that the percent of the variab 73.6 company performance is explained by the independent variables in the regression equation. While other 26.4 percent explained by other variables not examined in.
keyword research: analysis of system information, optimizing time and costs, the quality of functional projects and to the quality of the company's performance in Cv Putra Tiga Sekawan


Full Text:

PDF

Refbacks

  • There are currently no refbacks.